01 · Grind, then stop the moisture A moisture vapor barrier base We ground through patches and layers of failed coating, all the way to sound concrete. The first coat is a moisture vapor barrier epoxy, made to hold back exactly what had been lifting the old floors. Everything else is built on it.
02 · Flake, grout, topcoat Tidal Wave, locked in A full broadcast of Tidal Wave flake, a clear epoxy grout coat to lock it in, then a urethane topcoat with aluminum oxide. Tough, chemical resistant and easy to clean, which a sterile room needs.
03 · Six sections, no shutdown Around every sterilizer The department never closed. We built it in six sections, about 250 square feet at a time, around each of the giant equipment sterilizers, under infection-control rules, then tied every section into one seamless floor.