Cementitious overlays Resurface, don't replace

A new floor, NO NEW SLAB.

Worn, uneven, patched or stained concrete, or even a wood subfloor, turned into a smooth, solid base for polishing or coating. A fraction of the cost and the downtime of tearing it out.

A self-leveling cementitious overlay freshly poured across an office floor, still wet and glossy, its leading edge flowing over the bare concrete in the foregroundSelf-leveler, still wet: it flows out and finds its own level

Keep the slab. Fix the surface.

Bonds to prepped concrete Self-levels the dips and the patches Ready to polish or coat
Three overlays, three jobs

Pick the one your floor needs.

The Aeropostale entrance overlay ground and polished, blending into the polished concrete floorAeropostale, polished
01 · Make it polishable

Polishable overlay

Poured about 3/8" to 1/2"

When the old slab is broken out, patched or just won't polish up, we pour a new cement surface over it, about 3/8" to 1/2" thick. Once it cures it's ground and polished through the grits like any concrete floor. It becomes the floor: indoors, hard and seamless, with nothing on top to wear off.

A utility room freshly poured with a smooth, wet self-leveling underlayment, ready for a coating system
02 · Make it flat

Self-leveling underlayment

1/8" and up, self-leveling

For floors that are out of level, dished or patchy before a coating goes on. Anything over about 1/8" is self-leveling: it's poured, runs into the low spots and settles flat on its own. Then the coating system goes right over it.

New plywood sheets going down over open wood floor joists, the kind of floor that needs a rigid base before a coating
03 · Smooth it out

Skim coat, feather-edged

About 1/8", troweled

At about 1/8", an overlay can be self-leveling or troweled on as a skim coat that feathers out to nothing at the edges, so there's no ridge where it ends. It's how we smooth rough spots and transitions, and how a solid wood subfloor gets a hard, even surface before a coating.

Aeropostale: a polishable overlay, start to finish

A broken entrance, made part of the floor.

The store's entrance was tile over a broken slab with conduit running through it. We tore it out, poured a polishable overlay, ground it with the rest of the floor and polished it all as one.

Justin from 814 kneeling at the Aeropostale entrance after the old tile was torn out, conduit and broken concrete exposed
01 · Tear it outOld tile and broken concrete out, down to what's solid. That's Justin.
The 814 crew pouring polishable overlay straight from the mixer and troweling it across the Aeropostale entrance
02 · Pour itMixed on site and poured in one go, the crew troweling it out to the edges.
The freshly poured overlay at the Aeropostale entrance, still wet and glossy, taped off at the edge
03 · Let it levelStill wet, flat and smooth, edge to edge.
The cured overlay at the Aeropostale entrance ground along with the rest of the concrete floor
04 · Grind itCured, then ground right along with the rest of the floor.
The finished, polished overlay at the Aeropostale entrance shining with the polished concrete around it
05 · Polish itPolished with the floor. It's part of the concrete now.
Mighty Fine Donuts: plywood to urethane cement

A donut kitchen on a wood floor.

The Mighty Fine Donuts kitchen sits on a wood-framed floor. Wood flexes, and a hard floor on top of flexing wood cracks. So we built the subfloor the way the manufacturer requires: two layers of new 3/4" exterior-grade plywood, joints staggered, glued down and screwed every 6 inches, stiff enough to carry a hard floor. Then the urethane cement went on: seamless, tough against hot water and grease, and easy to hose down, on a floor that started as plywood.

If it flexes, the floor on top will crack. Stopping the flex comes first.

Plywood subfloor in the kitchen before the overlayBefore: plywood
The finished kitchen floor in chestnut brown urethane cement, seamless from wall to wall with floor drainsAfter: urethane cement
How we do it

An overlay is only as good as its bond.

Overlays fail for one reason more than any other: they weren't stuck to anything solid. So most of the work happens before anything is poured.

We come from concrete restoration. We read the slab before we cover it.

What about a warranty?

An overlay is part of the floor, not a separate product. Most of the time it goes underneath a system, so it's covered as part of that floor's warranty. A polishable overlay is poured 3/8" to 1/2" thick, indoors, and simply becomes the concrete floor; there's nothing on it to peel or wear off. That's why we don't sell a separate overlay warranty.

Straight talk

What it is, and what it isn't.

The right call when…

  • Your slab is sound but stained, patched, uneven or ugly
  • You want polished concrete and the old slab won't get you there
  • A wood subfloor needs to take urethane cement or epoxy
  • Tearing out and repouring would cost too much or take too long

Not what you need when…

  • The slab itself is breaking up, sinking or heaving. An overlay can't hold together a slab that's failing.
  • There's a moisture problem coming up through the slab that hasn't been dealt with. We test for it first.
  • A few cracks are the only problem. That's crack and joint filling.
  • You want a coating on its own over a sound, flat slab. No overlay needed; we go straight to prep and coat.
Need a slab assessment?

We'll tell you if it can be saved.

Every overlay starts on site. We'll check the slab or subfloor, test for moisture, and tell you straight whether an overlay is the right fix, which one, and what it costs.

Phone(814) 812-3118
Emailoffice@814epoxyandmore.com
AreaErie, PA and surrounding counties

We only use this to get back to you about your floor. Privacy