UV-cured coating
Walk on it right behind the machine.
This is the one that changes the math on downtime. The line goes down as a liquid, and a UV light runs right over it. By the time you're walking behind the machine, the line under your boots is about 99% cured. No barricades for the rest of the shift. No waiting overnight.
01Liquid goes down
The coating is applied wet, in your safety color, inside crisp taped edges.
02UV light runs over it
The UV machine passes right over the fresh line and cures it in seconds, not hours.
03Back to work
Walk on it as you go. That section goes straight back into production.
No downtime to dryCured by the light, so the area goes straight back into service. For plants, food processing and healthcare, that's the difference between doing the job and putting it off.
Built for trafficExtremely durable and resistant to abrasion. It won't crack or peel under heavy foot traffic, forklifts and pallet movers, and it cuts down the marring they leave behind.
Stands up to chemicalsResists the chemicals in your working environment and in your cleaning agents.
Holds its colorA tough urethane that resists weathering and won't yellow, so safety colors stay readable.
Same prep. Different cure. Different price.
Line goes downSame shiftNext dayCost
UV-curedWalk on it right away$$$$
PolyasparticFoot traffic in about 4 to 6 hours, forklifts next day$$$$
UrethaneLonger cure, depends on the product$$$$
Epoxy masticFoot traffic in about a day, forklifts in 3 to 7 days$$$$
Typical times at about 72°F. Cold, damp plants take longer. We'll give you the real schedule for your floor, product and season before we start.
The prep is the same, every time.Shot blasting takes what it takes. A line can only be as good as the concrete under it, so we never shortcut the prep, no matter which coating goes on top.
The cure is the difference.Epoxy mastic and urethane cost less, but need a longer cure, so the area stays closed longer. Polyaspartic costs a bit more because the chemistry costs more, and it's back in service in hours.
UV is the premium.Very few companies make UV-cure liquids, and they're expensive to make, so we pay a premium for them, and so does the job. What you buy with it is almost no downtime at all.
Weigh it against what an hour of downtime costs your plant. For a lot of shops, the coating that costs the most is the one that saves the most. We'll help you run that math, and spec what the space actually needs.
Antimicrobial option
Microban protection, built into the coating.
Through our partnership with DiamaPro Systems, our UV-cured striping can come with Microban antimicrobial protection built in. It helps keep bacteria, mold and fungus from growing on the line's surface, so your markings stay cleaner between cleanings.
- Healthcare and clinics
- Food processing and food service
- Locker rooms, washrooms and damp areas
- Any plant where clean really matters
The color code
A floor everyone can read.
Colors follow OSHA and ANSI guidance, so a new hire on day one knows where to walk, where not to stand, and where the fire extinguisher is, without reading a word. We'll match the standard your plant already uses.
YellowCaution. Aisles, traffic lanes, machine zones.
RedDanger and stop. Fire equipment, hazardous materials, emergency stops.
OrangeWarning. Electrical panels, moving parts.
GreenSafety. First aid, eyewash stations.
BlueInformation. Signage, employee areas.
WhiteEquipment and fixtures, racks, carts, work cells.
Yellow and blackPhysical hazards. Trip, bump and pinch points.
Red and whiteKeep clear. In front of panels, exits and safety gear.
Straight talk
Coated lines, or floor tape?
Tape has its place. Here's the honest difference.
Floor tape
- Fast to put down for a temporary layout
- Edges catch and peel under forklifts and pallet jacks
- Dirt collects at the edges, and it gets replaced again and again
- If your layout is still changing, tape first and stripe when it's settled
1yr
Our workmanship, guaranteed.
Every striping job comes with a 1-year workmanship guarantee against peeling and lifting. Lines wear with traffic, so instead of promising years we can't control, here's what to honestly expect.
Forklift aislesAbout 3 to 5 yearsWhere wheels turn and brake every day, lines wear fastest.
Pedestrian walkwaysMany years longerFoot traffic is easy on a coated line bonded to shot-blasted concrete.
When lines wearWe touch them upSame colors, same layout, same prep standard. Just the worn sections, on your schedule.
Expected life depends on traffic, cleaning and how the floor is used. We'll tell you what to expect for your floor before we start.